GMP Factory Extension and Upgrade, Averton Place
Mezzanine floor extension and new entry canopy. There are two parts for this project.
Part 1 is the concrete mezzanine floor inside the existing warehouse. The mezzanine floor is used a storage space, and part of the slab is be used for the processing plant with heavy machinery.
Part 2 is the high steel canopy at the entry. This is a typical steel portal frame structure.
- Year: 2014
- Area: Auckland



